Array ( [language] => Pimcore\Model\Property Object ( [name] => language [data] => [type] => text [ctype] => document [cpath] => [cid] => 8 [inheritable] => 1 [inherited] => 1 [resource:protected] => ) [navigation_title] => Pimcore\Model\Property Object ( [name] => navigation_title [data] => Compliance News [type] => text [ctype] => document [cpath] => [cid] => 8 [inheritable] => [inherited] => [resource:protected] => ) [navigation_name] => Pimcore\Model\Property Object ( [name] => navigation_name [data] => Compliance News [type] => text [ctype] => document [cpath] => [cid] => 8 [inheritable] => [inherited] => [resource:protected] => ) [navigation_class] => Pimcore\Model\Property Object ( [name] => navigation_class [data] => hide-regform [type] => text [ctype] => document [cpath] => [cid] => 8 [inheritable] => [inherited] => [resource:protected] => ) [form_join_us] => Pimcore\Model\Property Object ( [name] => form_join_us [data] => hide [type] => text [ctype] => document [cpath] => [cid] => 8 [inheritable] => [inherited] => [resource:protected] => ) )

Compliance News

/lv_electric_power_cable_0.jpg

LV cable developments driven by safety, environmental and EU market demands

  • Jun 05, 2015

Electric cable is very clearly a very mature technology, especially at the domestic low voltage end of the spectrum, but this doesn’t mean that developments aren’t taking place. Technologically speaking, most of the spectacular developments are happening with high voltage cables, especially superconducting cables for HV power transmission of the type that Nexans is very much involved with.

Read More


/vertical_fire_cable_test_0.jpg

State-of-the-art BASEC fire cable test lab is readied for start-up

  • Jul 09, 2014

The brand new BASEC laboratory facilities in Milton Keynes, which are currently being commissioned, have been designed to meet the rising demand for Construction Products Regulation 2011 (CPR) fire tests on electrical cables.

Read More


Selected options:

Brand
Search by brand
Search by topic